The following specifications provide Allan Block Corporation's typical requirements
and recommendations. At the engineer of record's discretion these specifications may
be revised to accommodate site specific design requirements.
|
SECTION 2
PART 1: GENERAL
|
|
1.1 Scope
|
Work includes furnishings and installing geogrid reinforcement, wall block, and
backfill to the lines and grades designated on the construction drawings and as
specified herein.
|
|
1.2 Applicable Sections of Related Work
|
Section 1: Allan Block Modular Retaining Wall Systems.
|
|
1.3 Reference Standards
|
See specific geogrid manufacturer’s reference standards.
Additional Standards:
-
ASTM D4595 - Tensile Properties of Geotextiles by the Wide-Width Strip Method
-
ASTM D5262 - Test Method for Evaluating the Unconfined Creep Behavior of Geogrids
-
ASTM D6638 Grid Connection Strength (SRW-U1)
-
ASTM D6916 SRW Block Shear Strength (SRW-U2)
-
GRI-GG4 - Grid Long Term Allowable Design Strength (LTADS)
-
ASTM D6706 - Grid Pullout of Soil
|
|
1.4 Delivery, Storage, and Handling
|
-
Contractor shall check the geogrid upon delivery to assure that the
proper material has been received.
-
Geogrid shall be stored above -10 F (-23 C).
-
Contractor shall prevent excessive mud, cementitious material, or other
foreign materials from coming in contact with the geogrid material.
|
PART 2: GENERAL
|
|
2.1 Definitions
|
-
Geogrid products shall be of high density polyethylene or polyester yarns
encapsulated in a protective coating specifically fabricated for use as
a soil reinforcement material.
-
Concrete retaining wall units are as detailed on the drawings and shall be
Allan Block Retaining Wall Units.
-
Drainage material is free draining granular material as defined in Section
1, 2.2 Wall Rock.
-
Infill soil is the soil used as fill for the reinforced soil mass.
-
Foundation soil is the in-situ soil.
|
|
2.2 Products
|
|
Geogrid shall be the type as shown on the drawings having the property requirements
as described within the manufacturer’s specifications.
|
|
2.3 Acceptable Manufacturers
|
A manufacturer's product shall be approved by the wall design engineer.
|
PART 3: WALL CONSTRUCTION
|
|
3.1 Foundation Soil Preparation
|
-
Foundation soil shall be excavated to the lines and grades as shown on the
construction drawings, or as directed by the on-site soils engineer.
-
Foundation soil shall be examined by the on-site soils engineer to assure
that the actual foundation soil strength meets or exceeds assumed design strength.
-
Over-excavated areas shall be filled with compacted backfill material approved
by on-site soils engineer.
-
Contractor shall verify locations of existing structures and utilities prior to
excavation. Contractor shall ensure all surrounding structures are protected from the effects of wall excavation.
|
|
|
|
3.2 Wall Construction
|
Wall construction shall be as specified under Section 1, Part 3, Wall Construction.
|
|
3.3 Geogrid Installation
|
-
Install Allan Block wall to designated height of first geogrid layer.
Backfill and compact the wall rock and infill soil in layers not to
exceed 8 in. (200 mm) lifts behind wall to depth equal to designed
grid length before grid is installed.
-
Cut geogrid to designed embedment length and place on top of Allan
Block to back edge of lip. Extend away from wall approximately 3%
above horizontal on compacted infill soils.
-
Lay geogrid at the proper elevation and orientations shown on the
construction drawings or as directed by the wall design engineer.
-
Correct orientation of the geogrid shall be verified by the contractor
and on-site soils engineer. Strength direction is typically perpendicular
to wall face.
|
-
Follow manufacturer’s guidelines for overlap requirements. In curves and
corners, layout shall be as specified in Design Detail 9-12: Using Grid
with Corners and Curves, see page 15 of the AB Spec Book.
-
Place next course of Allan Block on top of grid and fill block cores with
wall rock to lock in place. Remove slack and folds in grid and stake to
hold in place.
-
Adjacent sheets of geogrid shall be butted against each other at the wall
face to achieve 100 percent coverage.
-
Geogrid lengths shall be continuous. Splicing parallel to the wall face
is not allowed.
|
|
|
|
3.4 Fill Placement
|
-
Infill soil shall be placed in lifts and compacted as specified under
Section 1, Part 3.4, Unit Installation.
-
Infill soil shall be placed, spread and compacted in such a manner
that minimizes the development of slack or movement of the geogrid.
-
Only hand-operated compaction equipment shall be allowed within 3 ft
(0.9 m) behind the wall. This area shall be defined as the consolidation
zone. Compaction in this zone shall begin by running the plate compactor
directly on the block and then compacting in parallel paths to the wall
face until the entire consolidation zone has been compacted. A minimum
of two passes of the plate compactor are required with maximum lifts of
8 in. (200 mm). Section 1, Part 3.4 E, Page 4.
-
When fill is placed and compaction cannot be defined in terms of
Standard Proctor Density, then compaction shall be performed using
ordinary compaction process and compacted so that no deformation is
observed from the compaction equipment or to the satisfaction of the
engineer of record or the site soils engineer.
|
-
Tracked construction equipment shall not be operated directly on the
geogrid. A minimum fill thickness of 6 in. (150 mm) is required prior to
operation of tracked vehicles over the geogrid. Turning of tracked
vehicles should be kept to a minimum to prevent tracks from displacing
the fill and damaging the geogrid.
-
Rubber-tired equipment may pass over the geogrid reinforcement at slow
speeds, less than 10 mph (16 Km/h). Sudden braking and sharp turning
shall be avoided.
-
The infill soil shall be compacted to achieve 95% Standard Proctor
(ASTM D698). Compaction tests shall be taken at 3 ft (0.9 m) behind the
block and at the back of the reinforced zone. The frequency shall be
as determined by the on-site soils engineer or as specified on the plan.
Soil tests of the infill soil shall be submitted to the on-site soils
engineer for review and approval prior to the placement of any material.
The contractor is responsible for achieving the specified compaction
requirements. The on-site soils engineer may direct the contractor to
remove, correct or amend any soil found not in compliance with these
written specifications.
|

|
|
3.5 Special Considerations
|
-
Geogrid can be interrupted by periodic penetration of a column, pier
or footing structure.
-
Allan Block walls will accept vertical and horizontal reinforcing
with rebar and grout.
-
If site conditions will not allow geogrid embedment length, consider
the following alternatives:
- Masonry Reinforced Walls
- Increased Wall Batter
- Double Allan Block Wall
- No-Fines Concrete
- Soil Nailing
- Earth Anchors
- Rock Bolts
-
Allan Block may be used in a wide variety of water